RaubexBuilding Cape
Stock placeholder: drone aerial over a new low-rise housing development with mountains behind.STOCK PLACEHOLDER — REPLACE WITH RBC SITE PHOTOGRAPHY

Stellenbosch, Western Cape · Building since 2020

Building the Western Cape, properly.

Raubex Building Cape is the Raubex Group's coastal building contractor — the Western, Northern and Eastern Cape, and projects across Africa. A local team making local decisions, with the systems, safety culture and scale of a JSE-listed group behind it.

  • Building now
  • Planned · pre-construction
  • Completed
  • Head office · The Bosk, Newinbosch
  • Roads © OpenStreetMap contributors

Where we're building

5
On site
1
In pre-construction
2
Completed
3
Locations

Sites in Stellenbosch, Cape Town and Durbanville. Each site is published here at town level as its client signs off the detail.

The project register
Stock placeholder: two tower cranes silhouetted against a sunset sky.STOCK PLACEHOLDER — REPLACE WITH RBC SITE PHOTOGRAPHY

The lineage

1974
Raubex established
2007
Raubex Group lists on the JSE
2015
Raubex Building established
2020
First Raubex Building Cape project

What we build

Six sectors. One way of working.

All services

Group scale, local footing

A new name.
Not a new team.

Raubex Building Cape brings together the people, systems and supply chain delivering Coastal work - under a company that is run from the Western Cape.

  • 01

    Local

    Decisions are made in Stellenbosch by the people running your site, not routed through a head office two provinces away.

  • 02

    Backed

    Raubex Building Cape's systems, procurement network and plant, with the governance of a group listed on the JSE since 2007.

  • 03

    Proven

    A team that has delivered residential, commercial and institutional projects in the Western, Northern & Eastern Cape under the Raubex Building Cape name.

How we deliver

From tender to the day we hand over the keys.

Site wireframe · Decorative

  1. 01

    Tender & pre-construction

    We price what we'll build. Buildability reviews, an honest programme and a procurement plan before the first pour.

  2. 02

    Mobilise

    Site establishment, the safety file, subcontractor onboarding and a baseline programme everyone has signed.

  3. 03

    Build

    Weekly programme and cost reporting. Hold-point inspections per trade. Problems raised early, not at practical completion.

  4. 04

    Hand over & stand behind it

    A short snag list, complete close-out documentation, and a defects period during which we still answer the phone.

What we hold ourselves to

Safety, quality, and straight numbers.

  • Safety is planned, not policed.

    Every site starts with a risk assessment, a safety file and a method statement in line with the Construction Regulations, before anyone breaks ground.

  • Quality has hold points.

    Inspection and test plans per trade. Nothing gets covered up before it has been checked and signed off.

  • Cost and programme, reported weekly.

    You see the same numbers we do, progress against programme, cost against budget, and what changed.

  • Local first.

    Western Cape subcontractors and suppliers wherever the work allows, with skills development on every project.

  • Environmental management on every site.

    Dust, storm-water, noise and waste are managed to plan, not to complaints.

  • If a promise on this page is not being kept on your site, call us. That is what the local footing is for.

Track record

What is on the go, and what came before.

All projects
Stock placeholder: a sandstone mountain range at golden hour above a coastal road near Cape Town.STOCK PLACEHOLDER — REPLACE WITH RBC SITE PHOTOGRAPHY

Have a site in the Cape (Western, Northern or Eastern Cape) Region or Africa?

Tell us what you are planning - a tender, a development in feasibility, or a building that needs work. We will walk the site with you and give a straight answer on cost, programme and approach.

Discuss a project